Winnebago Mental Health Institute

Winnebago, MN | Energy

Overview

ISG worked with the Winnebago Mental Health Institute to install more efficient and reliable boiler systems.


Opportunity

For more efficient operations, the Winnebago Mental Health Institute opted to replace its coal boilers with gas/oil systems.

Solution

The Winnebago Mental Health Institute project included the demolition of three coal boilers and installation of two new 43,000 lb/hr gas/oil package boilers and one new 10,000 lb/hr gas oil package boiler operating at 120 psi, all with fintube economizers. Also included was the replacement of the existing RO System, condensate tank and pumps, feedwater pumps, blow tank, air compressors, fuel oil tank, and fuel oil pumps. The new DCS system was installed with individual controls for each boiler, plant wide balance, and all controls were installed with redundant input/output (I/O) and uninterruptible power supply (UPS).


Market News

ISG Named Business of the Year by Grow Cedar Valley

June 22, 2020 (Waterloo, Iowa) – Based on its growing presence in eastern Iowa and efforts to give back to the community, ISG has received the 2020 Business of the Year Award from Grow Cedar Valley, an organization devoted to the growth of businesses in the region. ISG’s Waterloo office was honored as one of two businesses of the year (1-50 full-time employees), marking the firm’s growing impact in the region since expanding its footprint to Waterloo in 2018.
Read More

ISG Bolsters Connectivity with Strategic Telecommunications Expertise Addition

May 29, 2020 (Green Bay, Wisconsin) – ISG, a professional design and engineering firm that serves both diverse markets and vast geographies, recently expounded upon its progressive strength and business unit diversification by welcoming long-time telecommunications leader Dan Nelson, PE. Based out of the Green Bay office, Dan and his team will continue to advance connectivity and further support clients on a national level.
Read More