Park Row Townhomes

St. Peter, MN | Housing

Overview

ISG designed this centrally located row-house-style residential complex with a number of different bedroom layouts and ample parking.


Opportunity

The growing St. Peter community was in need for more rental property, and the former hospital site provided a well-connected location in the heart of the city.

Solution

An ideal location for housing, this development stands at the intersection of two prominent residential streets and is within walking distance of the High School, Community Center, Library, and several city parks. The project is located on the site of the old Saint Peter Hospital which had been vacated for several years. The property is a residential row-house look with varying colors that identify each separate unit while blending in well with the existing residential neighborhood context. The new development consists of two buildings that combined include two one-bedroom handicap accessible units, 29 two-bedroom units, three one-bedroom units and six three-bedroom units. All units have at least one indoor parking space with half the units having two indoor parking spaces. In addition there is room for 48 parking spaces on the adjacent streets. Each building is 36,624 square feet. All units have access to a large shared green space between the two buildings.


Market News

ISG Moves Across the River to Support Growth and Enhance Client Services

September 13, 2022 (Waterloo, Iowa) – Building off of development momentum within the City of Waterloo, ISG is now the primary tenant of Art Bloc, a new mixed-use residential building overlooking the Cedar River in downtown Waterloo. ISG—a nationally recognized architecture, engineering, environmental, and planning firm—reimagined the second level interior, designing a state-of-the-art office build-out to facilitate collaboration and communication and improve operational efficiencies.
Read More

ISG Welcomes Project Manager Marty Metcalf – Former Waterloo Community School District Facility Director

May 5, 2022 (Waterloo, IA) – ISG is excited to continue to build upon its PreK-12 facility planning strengths with the addition of former Waterloo Community School District Facility Director, Marty Metcalf. Bringing over 40 years of facility management experience, including the oversight and maintenance of 21 school facilities with over 10,000 students, Marty will collaborate with school districts in Iowa and across the Midwest to develop strategic and implementable long-range plans.
Read More