U.S. Highway 59

Cedar Valley, IA | Public Works

Overview

The reconstruction of US Highway 59 from the Ida County line north to the City of Cherokee required gathering cross-sections at twenty-five foot intervals for the twelve-mile long project. The project involved surveying the existing alignment and grade of both lanes in order to design a smooth profile for the 6" PCC concrete overlay.


Opportunity

The goal of the project was to be able to mill out a portion of the HMA to better fit the new design profile while leaving a layer of HMA to use as a bond breaker between the original concrete and new concrete overlay.

Solution

ISG engineers designed independent horizontal and vertical alignments to better fit today's design standards while also controlling costs. The new alignments were submitted and approved by the IDOT resident engineer. ISG staff set paving hubs to control the milling of the asphalt and concrete paving operations.


Market News

ISG Welcomes Division I Collegiate Hockey Coach into Firm

July 27, 2021 (Mankato, Minnesota) – ISG welcomes Darren Blue, from Minnesota State University, Mankato’s Men’s Hockey, as one of its newest employee-owners. Blue will be joining the firm as a Development Strategist with the Sports + Recreation business unit, bringing a variety of sports experience from high school, semi-professional, and collegiate levels. His years both on the ice and at the bench as a coach, in multiple sports arenas, give the firm a look into the needs and desires of spectators, athletes, and staff alike.
Read More

ISG Welcomes Facilities Management and Planning Strategist, Thad Dahling

Thad Dahling joins ISG as a Facilities Management and Planning Strategist, providing school districts with facility assessments, deferred maintenance plans, and pre-referendum support to improve and enhance learning environments throughout the Midwest.
Read More