Le Sueur SWCD partnered with ISG to evaluate and design the restoration of a drained wetland basin. The project restored a 28.3-acre water storage basin with a 7-acre buffer, converting former agricultural and degraded wetland areas back to their historic, pre-drainage condition.
Designed to temporarily store water for up to 12 days, the restored basin increases watershed resilience and improves water quality in Lake Washington by reducing sediment and nutrient loading from high-intensity rainfall events. Construction was completed in November 2024, resulting in approximately 158 acre-feet of new water storage capacity and measurable reductions in pollutants and peak flows.