Kingsley Wastewater Treatment Plant

Kingsley, IA | Water

Overview

ISG designed the retrofit of existing wastewater treatment lagoons for the City of Kingsley, enabling more compliant and higher capacity wastewater treatment processes.


Opportunity

Anticipating growth over a 20-year planning period and with its wastewater treatment facilities no longer able to keep up with local standards, the City of Kingsley needed a water solutions partner to design system updates.

Solution

The City of Kingsley’s existing continuous discharge aerated lagoon was not capable of meeting NPDES effluent limits after changes were made to Iowa’s water quality standards. Following a detailed alternatives analysis, ISG recommended retrofitting the existing wastewater treatment lagoons using a Submerged Attached Growth Reactor (SAGR). The SAGR is primarily designed to provide nitrification (ammonia removal) in cold to moderate climates. The SAGR consists of a submerged gravel bed with evenly distributed wastewater flow across the width of the cell providing the necessary surface area for growth and attachment of a nitrifying biomass within the bed. The gravel bed is covered with a layer of peat or mulch for insulation. Aeration throughout the floor of the SAGR provides aerobic conditions that are required for nitrification. An effluent ultraviolet disinfection system also allows the City to meet more stringent bacterial limits during summer months.

Since the Iowa Wastewater Facilities Design Standards did not specifically address the SAGR type process, the Iowa DNR had to perform a technology analysis in order for Kingsley to proceed with the project. Based on the IDNR review, the SAGR system was approved as an acceptable alternative technology, and the City of Kingsley proceeded with one of the first installations in Iowa using the SAGR technology.


Market News

ISG Welcomes Project Manager Marty Metcalf – Former Waterloo Community School District Facility Director

May 5, 2022 (Waterloo, IA) – ISG is excited to continue to build upon its PreK-12 facility planning strengths with the addition of former Waterloo Community School District Facility Director, Marty Metcalf. Bringing over 40 years of facility management experience, including the oversight and maintenance of 21 school facilities with over 10,000 students, Marty will collaborate with school districts in Iowa and across the Midwest to develop strategic and implementable long-range plans.
Read More

ISG Invests in the Des Moines Community with New Office Location

February 22, 2022 (Des Moines, IA) – Eight years after establishing roots in Des Moines’ historic East Village, local architecture, engineering, environmental, and planning firm, ISG, opens its doors at a new location in the neighborhood.
Read More