ISG performed an assessment of the City of Humboldt’s road network and developed a long-term reconstruction schedule with implementation strategies.


Opportunity

With varying conditions in its road system, the City of Humboldt needed to develop a strategy that would enable strategic pavement management plans for the future.

Solution

This infrastructure planning project incorporated the services of ISG’s civil and municipal engineering and planning experts. An initial assessment of the condition of the City’s entire 45-mile road network was conducted. Each segment was provided a rating from 0 to 100 using the Pavement Condition Index. Preventative maintenance solutions were then provided based on the existing conditions. An annual budget was recommended for preventative measures to ensure streets are well maintained. A 50-year street reconstruction schedule was also developed which prioritized street improvements and provided current day cost estimates to help the City plan financially for future improvements. A work session with the City Council was conducted to share implementation strategies and recommendations.


Market News

Green Bay Firm Selected for Design and Construction of Foxconn Place Green Bay

November 25, 2019 – ISG and DeLeers Construction, Inc., together with Foxconn Technology Group (Foxconn), today announced that work will begin for the design and construction of Foxconn Place Green Bay’s 4,800 square-foot second floor located at the WaterMark Building in downtown Green Bay. After a stringent review of competitive bid submissions, Foxconn awarded ISG, a nationally recognized architecture, engineering, environmental and planning firm, and DeLeers Construction, Inc., the contracts. Both firms were chosen for their wealth of experience and understanding of the local Green Bay area.
Read More

Lake Crystal ramping up water quality improvement efforts

November 14, 2019 – LAKE CRYSTAL, Minn. (KEYC) — Water quality concerns in Lake Crystal are being addressed thanks to a group effort and the addition of a phosphorus removal system installed in Lake Crystal which is the first to be installed in the state.
Read More